full timeline
AI data center power demand
A surge in data center construction has driven a 50% increase in planned US natural gas power plants in just six months. The unprecedented buildout is straining local grids and raising questions about future electricity costs for homeowners.
Factlen Newsroom· Updated
Follow AI data center power demand in the Factlen app and get an alert when there is news. Get the app
Share this story
Key numbers
- 85-90 GW
- New nuclear capacity needed by 2030
- 92.5%
- Average nuclear capacity factor
- 300 MW
- Maximum output of a single SMR
Charts, maps and images
Show 11 moreShow fewer
Timeline
August 2026
US Building Twice as Much Gas-Fired Power as China to Fuel AI Boom
Is the AI Power Crisis Forcing the US to Finally Embrace Nuclear Energy as the Only 'Green' Solution?
US Data Center Power Demand Forecast to Consume 20% of US Electricity by 2035
Is the AI-Driven Power Demand Forcing a Quiet Retreat from US Climate Goals?
Global Data Center Power Consumption Reaches 2% of World Electricity and 6% of US Grid
- Global Data Center Power Consumption Reaches 2% of World Electricity and 6% of US GridA comprehensive analysis reveals that data centers now draw 67.7 gigawatts globally, driven by AI expansion and cloud computing.
- Is the AI Boom a Hidden Tax on Your Utility Bill and the Climate?As artificial intelligence drives a massive expansion of data centers, regulators and tech giants are clashing over who should pay for the resulting strain on the power grid.
- Brookfield and NextEra Plan $100 Billion AI Campus at Former DOE Site With Dedicated PowerA massive 1.2-gigawatt data center project in Kentucky aims to solve the AI power crisis by building its own dedicated natural gas and battery storage infrastructure.






